Technology Validation Requirements Top TenAffordability Technologies
The Task 2 results for the top ten affordability technologies are shown in this chart. Note that the Design Manufacturing and Producibility Simulation technology will be validated through analysis. These processes and tools will be used during the FATE or UCAV-ATD design and build activities. The results will be tracked and compared to baseline processes and tools to validate the DMAPS cost and cycle time benefits. The Wind Tunnel Test Productivity processes and tools will be validated during wind tunnel test activities.
Notes: