FATE--Block 1--Phase 1
This report documents work performed by Boeing-Phantom works for Wright Laboratory, Dayton, Ohio in response to contract F33615-97-C-3806. The period of performance was 30 June 1997 through 30 October 1997. Capt. Mark Cherry (WL/FI) was the Program Manager, Mr. Tom Black (WL/FI) was the Technical Manager, and Mr. Dave Brown (WL/FI) was the Technical Monitor. Mr. Jim Cupstid was the Boeing-Phantom Works Program Manager. The Boeing technical team included Dr. Ray Cosner, Dr. John Corrigan, Mr. Charles Saff, Mr. Jerry Amies and Mr. Kevin Aleshire. The Quality Functional Deployment effort was facilitated by Mr. Gary Gill, Mr. Dave Hamilton and Mr. Matt Vance.
This report is organized as indicated on the facing page.
Notes: