CG 47 CLASS ADVISORY NR 06-93 INTERIM FLUSHING PROCEDURES FOR PRAIRIE AND MASKER AIR COOLERS REF/A/CON/AEGIS PROG MGR/13JAN93// REF/B/DOC/INGALLS SHIPBLDG/-/-/NOTAL// REF/C/DOC/NAVSEA/-// REF/D/DOC/CDNSWC/-// NARR/REF A IS BLEED AIR SYSTEM MEETING, ARLINGTON, VA. REF B IS ACPY WORK SPECIFICATION 524-11-001 (CG 50 ONLY). REF C IS NSTM CHAPTER 254, HEAT EXCHANGERS AND AIR COOLERS. REF D IS PMS MRC 5516/B9 W61R N, LU-1, AIR COOLERS.// RMKS/1. THE PURPOSE OF THIS CLASS ADVISORY IS TO PROVIDE INTERIM FRESH WATER FLUSHING PROCEDURES FOR THE PRAIRIE AND MASKER AIR COOLERS IN ORDER TO IMPROVE BLEED AIR SYSTEM RELIABILITY. 2. BACKGROUND. A. CG 47 CLASS BLEED AIR SYSTEMS HAVE EXPERIENCED A HISTORY OF FAILED BLEED AIR VALVES. THE MAIN CAUSE OF VALVE FAILURE IS SALT WATER INTRUSION INTO THE B/A SYSTEM. B. THE B/A SYSTEMS HIGH OPERATING TEMPERATURE CAUSES A HARD SCALE DEPOSIT TO FORM ON THE AIR SIDE OF THE COOLERS WHEN SEA WATER ENTERS THE B/A SYSTEM THROUGH DETERIORATED PRAIRIE AND MASKER AIR COOLERS. AS SCALE IS DEPOSITED THROUGH THE B/A PIPING, IT CAN CONTAMINATE VALVES (APPROX 750) THROUGHOUT THE SYSTEM. TO DECONTAMINATE THE SYSTEM, ALL OF THE CONTAMINATED VALVES MUST BE OPENED/CLEANED AND THE ENTIRE PIPING SYSTEM FLUSHED. C. AS PER REF A, SEVERE CLOGGING OF COOLER TUBE BUNDLES HAS CONTRIBUTED TO BOTH MICROBIOLOGICAL ATTACK AND EROSION OF THE TUBE MATERIAL (90-10 CUNI). BOTH MECHANISMS ATTACK THE TUBE ALLOYS PROTECTIVE OXIDE LAYER. TO COMBAT THIS PROBLEM, A FRESH WATER FLUSH AND LAY UP OF THE PRAIRIE AND MASKER AIR COOLERS SHALL BE INITIATED WHEN THE B/A SYSTEM IS TO BE SECURED FOR GREATER THAN 72 HOURS. THIS WILL HELP REMOVE PARTICULATE MATTER BEFORE IT CAN CLOG TUBES AND WILL HELP IN THE PREVENTION OF SCALE BUILD UP. D. AEGIS CRUISER PLANNING YARD IS DEVELOPING A MODIFICATION SIMILAR TO REF B WORK SPEC, TO INSTALL FRESH WATER FILL AND DRAIN FITTINGS ON EACH COOLER. IN ADDITION, THE MODIFICATION WILL REPLACE THE CURRENT COOLER BUTTERFLY ISOLATION VALVES WITH NEW ISOLATION BALL VALVES. THIS WILL ALLOW THE SHIP TO EFFECTIVELY ISOLATE THE COOLERS FOR PREVENTIVE AND CORRECTIVE MAINTENANCE. E. CDNSWC (9214) IS DEVELOPING A CG 47 B/A SYSTEM FLUSHING/SOAK PROCEDURE FOR DECONTAMINATION OF THE B/A SYSTEM IN THE EVENT OF SALT WATER INTRUSION. THIS PROCEDURE WILL BE A MODIFICATION TO AN EXISTING DD 963 CLASS PROCEDURE. F. NAVSEA 05Y3D AND 05X23 ARE INVESTIGATING A LONG TERM RESOLUTION OF THE SALT WATER INTRUSION PROBLEM INCLUDING CHANGING COOLER TUBE MATERIAL AND BLEED AIR VALVE UPGRADES. 3. ACTION. CG 47 CLASS SHIPS SHALL FRESH WATER FLUSH AND LAY UP BOTH PRAIRIE AND MASKER AIR COOLERS WHEN THE BLEED AIR SYSTEM IS TO BE SECURED FOR GREATER THAN 72 HOURS. A. FOR SHIPS NOT EQUIPPED WITH COOLERS MODIFIED WITH FILL/DRAIN VALVES, UTILIZE THE FOLLOWING INTERIM PROCEDURES TO FLUSH THE PRAIRIE AND MASKER AIR COOLERS: (1) SHIPS WITH CONSECO MANUFACTURED PRAIRIE/MASKER AIR COOLERS AND THERMALXCHANGER PRAIRIE AIR COOLERS: (A) ISOLATE AND TAG OUT THE COOLER IAW CURRENT SHIPBOARD INSTRUCTIONS. (B) REMOVE COOLER SEAWATER VENT AND DRAIN PLUGS. (C) DRAIN SEAWATER SIDE OF COOLER TO THE BILGE AND REINSTALL DRAIN PLUG. ENSURE WATER DOES NOT COME INTO CONTACT WITH ELECTRICAL EQUIPMENT. (D) FILL COOLER WITH FRESH WATER UNTIL WATER APPEARS AT THE VENT: DRAIN AND REFILL. (E) REINSTALL VENT PLUG. (F) TAG IN COOLER LEAVING THE COOLER ISOLATION VALVES IN THE SHUT POSITION UNTIL ALIGNING THE COOLER FOR OPERATION. (G) PLACE A CAUTION TAG ON THE COOLER ISOLATION VALVES AND PACC GTM START PUSHBUTTONS AND EPCC GTG START PUSHBUTTONS: QUOTE-PRAIRIE AND MASKER AIR COOLERS ARE ISOLATED. ENSURE SEA WATER IS ALIGNED TO THE COOLERS PRIOR TO B/A SYSTEM OPERATION. -UNQUOTE (H) PERFORM THIS PROCEDURE EVERY TWO WEEKS WHILE IN LAY-UP IAW REF C. (2) DUE TO DESIGN AND MANPOWER CONSIDERATIONS, SHIPS WITH THERMALXCHANGER MANUFACTURED MASKER AIR COOLERS SHALL PERFORM A SALT WATER LAY-UP AS FOLLOWS: (A) UPON SECURING FROM SEA, SHUT THE COOLER ISOLATION VALVES. (B) PLACE A CAUTION TAG ON THE COOLER ISOLATION VALVES AND PACC GTM AND EPCC GTG START PUSHBUTTONS: QUOTE-MASKER COOLER IS ISOLATED. ENSURE SEA WATER IS ALIGNED TO THE COOLER PRIOR TO B/A SYSTEM OPERATION. -UNQUOTE (C) OPEN THE ISOLATION VALVES AND CIRCULATE SEA WATER THROUGH THE COOLER FOR TEN MINUTES ONCE A DAY TO REMOVE STAGNATED SEA WATER IAW REF C. THE COOLERS SHALL REMAIN TAGGED AND ISOLATED UNTIL THE B/A SYSTEM IS TO BE ACTIVATED OR THE SHIP IS MAKING PREPARATIONS TO GET UNDERWAY. B. FOR SHIPS WITH COOLERS EQUIPPED WITH MODIFIED FILL/DRAIN VALVES, UTILIZE THE FOLLOWING PROCEDURE: (1) ISOLATE AND TAG OUT THE COOLER IAW CURRENT SHIPBOARD INSTRUCTIONS. (2) OPEN DRAIN AND VENT VALVES, DRAIN COOLER. (3) CONNECT FRESH WATER HOSE TO COOLER FILL CONNECTION AND SHUT DRAIN VALVE. (4) FILL COOLER WITH FRESH WATER UNTIL WATER APPEARS AT VENT DRAIN AND REFILL WITH FRESH WATER. (5) REMOVE HOSE, SHUT VENT VALVE AND REINSTALL FILL CONNECTION END CAP. (6) TAG IN COOLER LEAVING THE COOLER ISOLATION VALVES IN THE SHUT POSITION. (7) PLACE A CAUTION TAG ON THE COOLER ISOLATION VALVES AND PACC GTM START PUSHBUTTONS AND EPCC GTG START PUSHBUTTONS: QUOTE- PRAIRIE AND MASKER AIR COOLERS ARE ISOLATED. ENSURE SEA WATER IS ALIGNED TO THE COOLERS PRIOR TO B/A SYSTEM OPERATION.-UNQUOTE (8) PERFORM THIS PROCEDURE EVERY TWO WEEKS WHILE IN LAY-UP IAW REF C. THE COOLER SHALL REMAIN ISOLATED UNTIL THE B/A SYSTEM IS TO BE ACTIVATED OR THE SHIP IS MAKING PREPARATIONS TO GET UNDERWAY. C. ALL CG 47 CLASS SHIPS SHALL UPDATE THE PRIOR TO UNDERWAY CHECK OFF LIST TO INCLUDE ALIGNING THE PRAIRIE AND MASKER AIR COOLERS PRIOR TO OPERATION OF BLEED AIR SYSTEM. D. ALL CG 47 CLASS SHIPS ARE TO ENSURE THE BLEED AIR LOW POINT DRAINS ARE FREE OF DEBRIS AND IN WORKING CONDITION. 4. EOSS. A. PERMANENT EOSS CHANGES ARE BEING DEVELOPED FOR SHIPS WITH MODIFIED COOLERS. CG 47 SHIPS EQUIPPED WITH MODIFIED FILL/DRAIN VALVES SHALL SUBMIT A ROUTINE EOSS FEEDBACK REPORT REFERENCING B/A HARDWARE CHANGES TO RECEIVE CORRECT EOSS. B. FOR CG 47 SHIPS NOT EQUIPPED WITH MODIFIED COOLERS, MAKE THE FOLLOWING PEN AND INK CHANGES TO EOSS: 1. FOR PROCEDURES BMAV, BMPA AND BSAA: REPLACE THE NOTE IN THE SECURING PROCEDURE WITH QUOTE- NOTE: THE BLEED AIR SYSTEM IS NORMALLY LEFT ALIGNED WITH THE EXCEPTION OF THE PRAIRIE AND MASKER AIR COOLERS. THE PRAIRIE AND MASKER AIR COOLERS WILL BE SECURED IN ACCORDANCE WITH CG 47 CLASS ADVISORY 06-93. -UNQUOTE. 2. FOR PROCEDURE MUTA: ADD AN ADDITIONAL STEP TO THE END OF PART IV, QUOTE- EOOW ORDER PRAIRIE AND MASKER COOLERS TO BE SECURED (SP NO. BMPA). -UNQUOTE. HIGHLIGHT THIS PEN AND INK CHANGE. 3. FOR PROCEDURE MUTS: ADD AN ADDITIONAL STEP TO THE END OF PART VI, QUOTE- EOOW ORDER PRAIRIE AND MASKER COOLERS TO BE SECURED (SP NO. BMPA). -UNQUOTE. HIGHLIGHT THIS PEN AND INK CHANGE. 5. COMNAVSURFLANT/COMNAVSURFPAC - RECOMMEND TASK ALL CG 47 SHIPS TO ADHERE TO PARA 3 AND 4 ACTIONS. 6. FOR CDNSWC (1423) - CONTINUE DEVELOPING EOSS PROCEDURES USING PARAGRAPH 3 AND 4 GUIDANCE FOR SHIPS WITH MODIFIED BLEED AIR COOLERS. 7. FOR CDNSWC (1413) - CHANGE PERIODICITY OF REF D PMS PROCEDURE TO AN AS-REQUIRED CHECK TO BE ACCOMPLISHED WHENEVER THE BLEED AIR SYSTEM IS TO BE SECURED FOR GREATER THAN 72 HOURS. MODIFY REF D PROCEDURE TO INCORPORATE PARA 3.B GUIDANCE. REF D PMS PROCEDURE CANNOT BE PERFORMED UNTIL BLEED AIR COOLER FILL/DRAIN VALVE MODIFICATION HAS BEEN COMPLETED. 8. THIS CLASS ADVISORY HAS NO IMPACT ON CMMP AND WILL BE CANCELLED WHEN REF D AND EOSS PROCEDURES BMAV, BMPA, BSAA, MUTS AND MUTA HAVE BEEN MODIFIED. 9. ORIG POC IS MR. N. SMITHSON, PMS400F511, DSN 332-5959 OR COMM (703) 602-5959. BLEED AIR SYSTEM TPOC IS MR. D. ELLIS, SEA 05Y3D, DSN 332-5728 OR COMM (703) 602-5728. HEAT EXCHANGER TPOC IS MR. W. AERNI, SEA 05X23, DSN 332-6794 OR COMM (703) 602-6794.//