Chapter Four
P
REPOSITIONING AND DEPLOYMENT OF ARMY WATERCRAFTWhere we are... Where we’re going... How we’ll get there...
4-1. PURPOSE. The purpose of this chapter is to outline the requirements to preposition watercraft and to identify the follow-on flow of CONUS-based watercraft to the theater. Prepositioning and follow-on deployment of Army watercraft are addressed in terms of where we are, where we’re going, and how we’ll get there.
4-2. PREPOSITIONING — WHERE WE ARE.
A. The purpose of prepositioning is to locate sufficient Army watercraft overseas, either afloat, area prepositioned, or forwarded stationed, in order to meet reaction times required by the ASMP. In March 1993, the need to preposition Army watercraft was briefed to and approved by the Chief of Staff of the Army (CSA). Today, the prepositioned fleet of watercraft does not meet ASMP requirements.
Table 4-1. Status of Prepositioned Army Watercraft as of Jun 99
|
American Cormorant (Nov 97) |
Strong Virginian (3rd Qtr 98) |
Gopher State |
Hythe, U.K. storage |
Leased and aboard LASH ships |
|
Vessels currently |
LSV |
0 |
0 |
0 |
0 |
0 |
2 |
2 |
LCU-2000 |
3 |
4 |
0 |
0 |
0 |
0 |
7 |
LCU-1600 |
0 |
0 |
0 |
3 |
0 |
0 |
3 |
LT 100' |
3 |
0 |
0 |
3 |
0 |
0 |
6 |
Floating crane |
1 |
0 |
0 |
2 |
0 |
0 |
3 |
LCM8(mod1) LCM8(mod2) |
1 1 |
0 1 |
3 0 |
3 2 |
0 0 |
0 0 |
7 4 |
LARC-60 |
0 |
0 |
0 |
4 |
0 |
0 |
4 |
FMS (maint) |
0 |
0 |
0 |
0 |
0 |
0 |
0 |
BCDK |
0 |
0 |
0 |
0 |
0 |
0 |
0 |
CMF |
0 |
0 |
0 |
0 |
0 |
0 |
0 |
RRDF |
0 |
0 |
1* |
0 |
0 |
0 |
1 |
CF |
0 |
0 |
0 |
0 |
0 |
0 |
0 |
FC |
0 |
0 |
1* |
0 |
0 |
0 |
1 |
Barge, fuel Barge, cargo |
1 |
0 |
0 |
9 6 |
0 |
0 |
10 6 |
LSC |
0 |
0 |
0 |
0 |
0 |
0 |
0 |
Pusher tug |
0 |
0 |
0 |
0 |
6 |
0 |
6 |
Total |
10 |
5 |
5 |
32 |
6 |
2 |
60 |
*Includes 4 SLWT’s on the Gopher State.
A description of the contents of each column is provided below.
1) American Cormorant , Strong Virginian and Gopher State. There are currently three afloat preposition ships loaded with Army watercraft, (HLPSI) American Cormorant (HLPSII) Strong Virginian and (TAC-S) Gopher State. HLPS I loaded in November 1997, HLPS II loaded 4th Quarter FY 1998 and TAC-S loaded 3rd Quarter FY1999.
2) Hythe, U.K. Maintenance/Storage Activity, Combat Equipment Base-North Atlantic. Vessels are in storage at the Hythe, which is currently designated Major Theater War-East (MTW-E) site by Third US Army (see Fig.4-1). These vessels make up a follow-on load for the American Cormorant or Strong Virginian or can self deploy from Hythe to SWA, particularly LCU’s and LT’s.
4) Forward stationed. The two LSVs forward stationed in the U.S. Pacific Command (PACOM) AOR are part of the prepositioned fleet. The craft are crewed and operational.
5) Vessels currently in prepo. Reflects the sum of all previous columns.
4-3. PREPOSITIONING — REQUIREMENT. The foundation of the preposition requirement is the off-loading of the afloat heavy brigade in six days. Review and analysis of the existing prepositioned fleet revealed it is not adequate to accomplish the required mission.
A. A computer-based optimization model of the JLOTS process was used to determine the most economical mix of watercraft required to complete the off-load of the afloat heavy brigade in six days (see chapter five for description of the model). The model includes many aspects of the LOTS process, however, certain assumptions were required to allow selection of the optimum mix of craft. The assumptions that guided the modeling process and final selection of the preposition set were:
1) The heavy lift prepositioned ship(s) (HLPS) and tactical auxillary crane ship (TAC-S) must be off-loaded two days prior to commencement of LOTS.
2) The afloat heavy brigade and APS-3 will arrive not later than (NLT) C+6.
3) The operation will begin with an instream discharge of the Army heavy brigade afloat.
4) Capability will exist to work two LMSRs simultaneously, consisting of four RO/RO and two lift-on/lift-off (LO/LO) lanes on one ship, and two RO/RO and two LO/LO on another. This assumes that three RRDFs will be available.
5) The ASMP requires the afloat heavy brigade ashore NLT C+15 (four LMSR ships).
6) Partial fixed-port operations will be available by C+20.
7) Some ships may require instream discharge regardless of available port facilities due to service draft limitations.
8) APS-3 prepositioning will be augmented by watercraft deployed from CONUS to support CINC requirements as necessary.
9) APS-3 watercraft will support follow-on CINC JLOTS, to include intracoastal main supply routes (IMSR) requirements.
10) A lift-on/lift-off (LO-LO) ship was contracted (Strong Virginian) and a Tactical-Auxiliary Crane Ship (T-ACS) is also leased. The Army port opening package consists of 2 HLPS’s, 1 TAC-S and forward stored/stationed watercraft in MTW-E and W (see Fig.4-1).
11) Prepositioned watercraft will be deployed in unit sets, where possible. Some prepositioned watercraft are in excess of unit sets and some units have insufficient watercraft prepositioned based on mission requirements.
12) Expected Operational Readiness (OR) rate of 75 percent.
13) Personnel and materials handling equipment (MHE) are available.
B. Development of the preposition requirements was based on the deployment of watercraft in unit sets, where possible. This is in accordance with Army policy and ensures that Headquarters and support elements necessary for operation of individual craft are also included. The unit sets required to support prepositioned watercraft for a single geographical location are depicted in Table 4-2 (p. 4-4). This mix of transportation units will provide the ability to accomplish any type of Army watercraft mission in any location.
Table 4-2. Unit Requirements for Prepositioning
|
|
Source |
Transportation Detachments (LSV) |
2 |
55530LJ00 |
Transportation Company Heavy Boat (ALO3) |
2 |
55829L000 |
Transportation Company (Floating Causeway) |
1 |
55500LC00 |
Floating Causeway |
2 |
55530LK00 |
RRDF |
3 |
55530LM00 |
Causeway Ferry |
4 |
55530LN00 |
Transportation Company (Floating Craft) |
1 |
55500LC00 |
Platoon HQ |
1 |
55500LB00 |
Barge, Liquid Cargo (Fuel) |
3 |
55530LC00 |
Small Tug |
1 |
55530LD00 |
Large Tug |
6 |
55530LI00 |
Floating Crane |
3 |
55530LEI00 |
LCM-8 Modification 2 |
1 |
55530LB00 |
Transportation Company (Floating Craft Maintenance) |
1 |
55613L000 |
Transportation Detachment (LARC-LX) |
1 |
55530LH00 |
Transportation Company (Medium Boat) (-) |
1 |
55828L000 |
C. A total of 63 craft are required to support both the unit sets listed in Table 4-2 and additional mission requirements. The preferred method of prepositioning, is loading 63 craft aboard HLPS, that are capable of responding, to any location throughout the world. Today, the American Cormorant, Strong Virginian, and Gopher State are the only strategic sealift assets contracted to deliver Army preposition watercraft and causeway systems. However, their cargo capacity is not adequate to load all 63 watercraft. The lack of adequate cargo capacity necessitates that an alternative preposition strategy be followed. The most economical approach is to use a combination of two HLPSs and one TAC-S, area prepositioning and forward stationing of crewed craft. This combination strategy will provide a preposition force that is capable of executing and accomplishing ASMP objectives. However, it does result in an increase in the total number of craft that are prepositioned from 63 to 75. The quantity, type, and preposition strategy of each craft is shown in Figure 4-1 (p. 4-5). The majority of the required capability is loaded aboard two HLPSs and one TAC-S. The modular causeway systems are stored and transported aboard the TAC-S, HLPS or LMSR ships. This plan only includes watercraft necessary to support a single contingency, but it does provide the ability to cover either of two geographical areas. This is accomplished by forwarding stationing and area prepositioning in locations most likely to experience hostilities. The mix of craft chosen for loading aboard the HLPS was selected to optimize the limited loading space and provide a mix of capability; i.e. cargo capacity, tug capability, and lift capability, in the event the vessels were deployed to a location where area prepositioned craft are not available. The location of the forward stationed and area prepositioned craft will be determined based on the location of the most likely contingencies. The forward stationed LSVs will be crewed and in service. The area prepositioned craft will be dry or wet stored.
The current number and mix of craft in the Army inventory is not adequate to execute this prepositioning strategy. Limited procurement of LSVs and LCU-2000s is required before the necessary prepositioned watercraft capability can be deployed.
Figure 4-1
FIG.4-1 SHOULD BE CHANGED AS FOLLOWS:
FORWARD STATIONED WEST/EAST TITLES CHANGED TO MTW-E AND W
UNDER MTW-E:-STORED MTW-W:-STORED
2xLCU2000 2xLCU2000
5xLCM8 (mod1) 4xLCM8 (mod1)
1xLCM8 (mod2) 1xLCM8 (mod2)
2xLARC 2xLARC
3xLT
6xST
9xBG
6xBC
1xBD
CREWED CREWED
2xLSV 2xLSV
UNDER AFLOAT PREPO AMALGAMATE TWO HLPS, TAC-S, LMSR AND/OR SEEBEE AS ONE TITLE WITH THE FOLLOWING WATERCRAFT STORED:
7xLCU2000
4xLCM8 (mod1)
2xLCM8 (mod2) THE OTHER TITLE LASH SHIPS WITH
3xLT THE FOLLOWING CRAFT STORED:
1xBD 6xLEASED PUSHER TUGS
1xBG
3xRRDF (inc. 6 SLWT’s)
2xFC (inc. 4 SLWT’s)
4xCF
UNDER SPT EQUIP ABOARD APS-3 INCLUDE ALSO UNITS MTOE.
4-4. PREPOSITIONING — HOW WE’LL GET THERE. In order to implement our prepositioning strategy, we have identified objectives that are both aggressive and challenging. Specifically, we will:
A. Build a prepositioned Army watercraft package that will be able to accomplish ASMP objectives using a combination of afloat prepositioning, area prepositioning, and forward stationed craft. Afloat prepositioned craft will deploy to the contingency area to join the forward stationed fleet already in the region.
1) Craft forward stationed will be wet or dry stored. Only LSVs will be crewed; all others will be maintained as Army prepositioned stocks.
2) Craft prepositioned afloat (APS-3) will be loaded aboard HLPSs, TAC-S, LMSRs, LASH and/or SEABEE ships.
3) The afloat prepositioned set will link up with either set of the area prepositioned and forward stationed craft to accomplish off-load of the afloat heavy brigade.
4) After downloading, APS-3 port opening ships will return to CONUS and upload TOE craft and return with the follow-on craft necessary to satisfy identified CINC sustainment and intracoastal MSR requirements.
B. Identify unit sets by SRC.
C. Pursue avenues to make available for Army use, existing APS-3 sealift assets for afloat prepositioning of Army watercraft.
D. Require sufficient sealift assets to preposition APS-3 watercraft that will deploy to a contingency area, to join the area prepositioned and forward stationed fleet already in the region. The addition of a SEABEE ship may provide an economical and operationally efficient way to provide additional lift capability for a portion of the remaining prepositioned watercraft requirement. SEABEE ships can be used to transport assembled causeways that cannot fit onto TAC-S, preloaded LARCs, preloaded LCMs, and barges (fuel and cargo). Preassembled modular causeway systems (MCSs) will not fit on the deck of a TAC-S, but will fit on the deck a SEABEE. In order to identify all possible transport options and ensure the most efficient use of strategic sealift assets, we will generate a stow plan for MCSs.
E. Maximize space available for watercraft and MHE aboard APS-3 ships.
F. Develop a plan to upload HLPS’s with CONUS-based TOE craft immediately following download at a contingency.
G. Endeavor to add Army watercraft to Pacific Command (PACOM) and U.S. Central Command (CENTCOM) Army prepositioned stocks for accountability and maintenance.
H. Review APS-3, area prepositioned, and forward stationed watercraft cyclic maintenance schedules and locations.
I. Review potential contract augmentation and host-nation support contracts that may change the stated requirements.
J. Solicit input from Army components to validate the Army capability required in CINC AOR and highlight watercraft units for inclusion on, in CINC time phased force deployment data (TPFDD).
K. Recommend changes to doctrine and realignment of structure to support Army Strategic Mobility and Unified Command watercraft requirements.
L. Maintain a capable fleet of Army watercraft by executing our Modernization Strategy (see Chapter Six).
4-5. FOLLOW-ON DEPLOYMENT
A. The craft required for prepositioning were selected to off-load the afloat heavy brigade in six days. The quantity and capability of the prepositioned craft are not adequate to satisfy CINC throughput requirements or perform intracoastal MSR missions that will exist throughout the duration of the campaign. Analysis of CINC and ASMP requirements identified the need for additional CONUS-based craft to perform LOTS, intracoastal missions, and utility functions. The throughput requirements were translated into required watercraft capability through the use of a LOTS computer model (see paragraph 5-4 for description of model). The craft totals resulting from the mission analysis were translated into unit sets. The time phased arrival of each unit, prepositioned and CONUS based, required to support the most demanding CINC requirement is shown in Figure 4-2. Arrival time of CONUS craft will depend on the time notification to deploy is received, distance to the contingency, weather encountered in route, and type of craft.
B. Deployment of CONUS-based follow-on craft will be accomplished by a combination of self-deployment and a second load on the HLPSs. The first craft arriving in the theater, after those prepositioned, will self-deploy. In order for these craft to arrive in the required timeframe, a decision to deploy must be made prior to C day to allow the craft to sail on or before C day. With the exception of the LSV, the remaining craft necessary to support CINC requirements would be transported as a second HLPS load. This final group of craft is required to support the second workload peak experienced during the counter-offensive phase.
4-6. SUMMARY. The foundation of our prepositioning strategy is off-loading the afloat heavy brigade in six days. As such, we will employ a combination strategy of afloat preposition, area preposition, and forward stationing. This strategy will ensure that adequate watercraft capacity is available to support JLOTS and intracoastal MSR requirements in either of two geographical locations. We have built a prepositioning capability that focuses on the most demanding early entry watercraft mission — Logistics Over-the-Shore. As reception of the force proceeds, and infrastructure improvements are made, we expect to quickly transition to fixed-port operations with LOTS/JLOTS augmentation. Follow-on craft, deployed from CONUS, will provide the additional capacity necessary to meet the identified throughput requirements. Follow-on deployment will include self deploying craft and a second HLPS load. The existing Army watercraft fleet is not adequate to implement the required prepositioning strategy or capable of providing the necessary follow-on craft. Procurement of additional LSVs and LCU-2000s must be accomplished before this plan can be fully executed. The current FY 00-05 Program Objective Memorandum (POM) identifies funding for 3 LSVs and 4 LCU-2000s. If funding is authorized, this will complete LSV requirement for 9 vessels and will reduce LCU-2000 requirement to 11 additional vessels.