USS HARPERS FERRY LSD-49 (CV) SHIP’S LOADING CHARACTERISTICS PAMPHLET

TABLE OF CONTENTS


Preface
Record of Changes and LFORM Supplements
Distribution List
Table of Contents
Abbreviations List
Standard Terminology
Standard Symbols
Metric System

SECTION I: GENERAL
           1. Principal Characteristics
           2. Organic Landing Craft, Boats, and Helicopters
           3. Well Deck Capacity
           4. Vehicle Stowage Area (VSA) Capacity
           5. 01 Level & Truck Tunnel Capacity
           6. Vehicle Turning Area (VTA) Capacity
           7. Staff, Troop, and Crew Living Accommodations
           8. Medical Capabilities
           9. Troop Cargo Capacities

SECTION II: LOADING, STOWAGE, OFF-LOADING INFORMATION
           1. General Cargo Stowage
           2. Heavy Lift, Outsized Cargo, CONEX Handling, and Stowage
           3. Ammunition Stowage
           4. Nuclear Weapon Stowage
           5. Dangerous Cargo (Less Class IV and V) Stowage
           6. Petroleum Oil Lubricants (POL)
           7. Vehicle Stowage (Less Full Bulk Fuel Carriers)
           8. Aircraft (Non-Operational) Stowage
           9. Aircraft (Operational) Stowage
           10. Landing Force Operational Reserve Material (LFORM)
           11. Landing Craft/Amphibious Vehicle Stowage
           12. Troop Weapon Stowage Area(s)
           13. Ship's Cargo Handling Equipment (CHE)/Facilities
           14. Ramps and Stern Closures
           15. Causeways and Warping Tug Embarkation
           16. Ship Docking and Berthing Information
           17. 01 Level Deck Drawing
           18. Boat Deck (01 Level) Drawing
           19. Flight Deck (Raised 01 Level) Drawing
           20. Main Deck Drawing
           21. 2nd Deck (Forward) Drawing
           22. 2nd Deck (Aft) Drawing
           23. Main Deck (Aft) and Well Deck with LCAC Stowage
           24. Main Deck (Aft) and Well Deck
Page
i
ii
iii
viii
x
xvii
xix
xx

I-1
I-1
I-1
I-1
I-1
I-1
I-2
I-2
I-2
I-3

II-1
II-1
II-1
II-2
II-2
II-2
II-3
II-3
II-3
II-3
II-4
II-4
II-4
II-4
II-5
II-6
II-6
II-7
II-8
II-9
II-10
II-11
II-12
II-13
II-14

SECTION III: EMBARKATION/DEBARKATION PROCEDURES
           1. Embarkation Procedures
           2. Debarkation Procedures

SECTION IV: TROOP LIVING ACCOMMODATIONS, HEAD FACILITIES
           1. Troop Living Space w/Head Facilities Diagrams
           2. 05 Level Deck Diagram
           3. 04 Level Deck Diagram
           4. 03 Level Deck Diagram
           5. 02 Level Deck Diagram

SECTION V: SERVICE AND SUPPORT FACILITIES

SECTION VI: PERSONNEL AUGMENTATION REQUIREMENTS FROM
                        EMBARKED ORGANIZATION

SECTION VII: EMBARKED ORGANIZATION WORKING SPACES
           1. Troop Working Space Diagrams
           2. 05 Level Deck Diagram
           3. 01 Level Deck Diagram
           4. Boat Deck Diagram
           5. Main Deck (Forward) Diagram
           6. 2nd Deck (Aft) Diagram
           7. Main Deck (Aft) Diagram

SECTION VIII: TROOP CARGO SPACE CAPACITY BREAKDOWN
           1. 4th Deck and 3rd Deck Diagram

SECTION IX: CARGO SPACE LIMITATIONS

SECTION X: PROFILES/WEATHER DECK PRESENTATIONS
           1. Starboard Profile/Inboard
           2. Port Profile/Inboard
           3. 01 Level Boat Deck Diagram
           4. Flight Deck (Raised 01 Level)

SECTION XI: DIAGRAMS
III-1
III-1
III-1

IV-1
IV-5
IV-23
IV-24
IV-25
IV-26

V-1

VI-1


VII-1
VII-2
VII-9
VII-10
VII-11
VII-12
VII-13
VII-14

VIII-1
VIII-2

IX-1

X-1
X-1
X-2
X-3
X-4

XI-1