SYNOPSIS: THE AIR DEFENSE STAFF PLANNING VAN WILL PROVIDE S1/S4 CAPABILITIES AT BDE AND BELOW.
ACQUISITION CATEGORY:
ACQUISITION PHASE:
PE & LINE #:
DESCRIPTION: The Air Defense Tactical Operations Center (ADTOC) Command Post (CP) will consist of processors, displays, software, and communications equipment to meet the staff planning Force operations needs of FAAD, PATRIOT, and other Extended Air Defense systems, using available ATCCS S/W and Common Army Hardware/Software (CHS). The Van will be a Standard Integrated Command Post System (SICPS) shelter mounted on a HMMWV. The Brigade TOC and the FAADC2I system will be merged into this program by FY2002.
TRANSPORTATION CHARACTERISTICS / LIMITATIONS:
HISTORICAL BACKGROUND:
Jul 93 Inception of Idea.
REQUIREMENTS DOCUMENT: PATRIOT PAC III ORD, ADTOC UFD. ADTOC ORD (Draft).
TYPE CLASSIFICATION:
EVENT SCHEDULE FISCAL YEAR
96
97
98
99
00
01
QTR
1 2 3 4
1 2 3 4
1 2 3 4
1 2 3 4
1 2 3 4
1 2 3 4
Released ORD
1