FATE Block I, Phase I Study Objectives
Recommend Ground Control Station & Mods
- Develop Methodology To Compare Technologies
- Assess Maturity, Risk Level, Fallback
- Assess Payoffs to FWV Goals & Unmanned Systems
- Develop First-Level Interface Requirements
- Survey Existing Ground Control Stations
- Assess Attributes Required for Demonstration Program
Notes:
Our FATE Phase 1 contract was divided into two major efforts: identifying high-payoff technologies and the surveying ground control station systems and requirements.