C-130
C-130 Broad Area Review
(January 1998)
TABLE OF CONTENTS
Section
Description
Page
Tasking from the Secretary of the Air Force
1
Executive Summary
2
Team Composition
2
Approach
2
Fleet Safety Record
2
Action Taken
3
Recommendations
3
1.0
C-130 Operating Environments and Missions
6
1.1
Background
6
1.2
C-130 Operating Environments and Missions
7
2.0
Aircraft Systems
10
2.1
Introduction
10
2.2
Structures
10
2.3
Propulsion (Propellers & Engines)
11
2.4
Fuel System
14
2.5
Electrical System
20
2.6
Pneumatic System
24
2.7
Hydraulic System/Flight Controls
25
3.0
Operations and Training
26
3.1
C-130 Technical Manuals ("Technical Orders")
26
3.2
Aircrew Life Support Equipment
27
3.3
Ditching/Bailout
27
3.4
C-130 Aircrew Training
28
4.0
Maintenance
35
4.1
C-130 Maintenance Training
35
4.2
Maintenance Experience Levels
35
4.3
C-130 Maintenance Inspections
36
4.4
Depot Level Maintenance Impact On Flight Safety
36
4.5
Maintenance Practices
38
4.6
Technical Orders
39
5.0
C-130 Mishap Review
40
5.1
USAF Mishap Data
40
5.2
Worldwide Mishap Data
41
5.3
Uncommanded Power Reductions
42
5.4
Possible Fuel Starvation Incidents
45
6.0
King 56 Accident Summary
50
6.1
Established Facts
50
6.2
Flight Operations
50
6.3
Scenario Introduction
52
6.4
Scenarios Evaluated
56
6.5
Summary
83
7.0
Test Summaries Pertinent to the King 56 Mishap
89
7.1
March 1961 Lockheed Report ER-4120; Full Scale Mockup Test of the C-130B Fuel Feed System
89
7.2
April 1988
Lockheed Report LG88ER0071; C-130 Four Engine Power Reduction Test
89
7.3
Engine Testing Conducted at Allison in 1988
90
7.4
October 1997 Allison Temperature Datum Low Voltage
91
7.5
November 1997 Allison Air Injection Test (Test Stand)
92
7.6
November 1997 Edwards AFB Testing
92
7.7
December 1997 Allison Air Injection Test (Aircraft)
97
7.8
Innovative Technologies Report, Synchrophaser FMEA
98
8.0
C-130 Fleet Safety Corrective Actions
99
8.1
Complete
99
8.2
In Progress
100
8.3
Future
100
9.0
Appendices
103
9.1
Glossary of Terms
103
9.2
Team Members and Advisors
106