Pre-Overhaul/Maintenance Avail
Operational Status:
- Re-deployment ready (M-1)
- Specifics outlined by CINC/Fleet Cdr
Objectives:
- Crew Leave
- SRA concurrent work package development
- Engineering and combat system groom
- Commence formal school attendance
- SRA/ROH preparation
- Crew rotation
Notes: Maintain the integrity of this period. Get the crew on leave. Identify surge requirements. Dont over schedule and stay in touch with weapon stations. Off load call downs will occur when ship is on deployment. Work package development is maintained through out the deployment. School identification should occur during CART I.