Table of Contents
Conventional Steam Plant OverviewLT Cox
Training Objectives
Steam Plant Layouts&Normal Steaming Configurations
Machinery Space Config.
Machinery Space Config.
PPT Slide
LHA / LHD Norm. Config.
LHA / LHD Layout
PPT Slide
LPH / LCC / MCS Normal Config.
LPH / LCC /MCS Layout
PPT Slide
LSD / LPD Normal Config.
LSD / LPD Layout
AD Normal Configuration
AD Layout
AFS / AE Normal Config.
AFS / AE Layout
AO-177 Normal Config.
AO-177 Layout
AOE-1 Normal Config.
AOE-1 Layout
AOR-1 Normal Config.
AOR-1 Layout
CV Normal Config.
CV Spaces Layout
CV Layout
Steam Plant Watchstation Organization
Inport Watch Org.
Engineering Duty Officer
EDO Organizational Relationships
Engineering Duty Officer
EDO Duties
EDO Duties
EDO Duties
Inport Watch Org.
Inport Watches
Inport Watch Org. (Aux Steaming)
Engineroom Watch Org.
Fireroom Watch Org.
Inport Watch Structure
Inport Watch Structure
Inport Watch Organization
Inport Watch Organization
Engineering Officer of the Watch
EOOW Responsibilities
EOOW Responsibilities
EOOW Responsibilities
Underway Watch Org.
Watch Rotation At Sea
Watch Rotation Inport
Watchstander Qualifications
Engineering Training Team & Damage Control Training Team
Steam Plant Operations
Cold Iron
Steam Plant Operations
Aux Steaming
Steam Plant Operations
Casualties
Casualties
Review and Summary
Questions
|
Author: Mark, Beth, Amanda, & Xander
|