Engineering Training

Conventional Steam Plant Overview LT Cox

02 Feb 1997


Click here to start


Table of Contents

Conventional Steam Plant Overview LT Cox

Training Objectives

Steam Plant Layouts & Normal Steaming Configurations

Machinery Space Config.

Machinery Space Config.

PPT Slide

LHA / LHD Norm. Config.

LHA / LHD Layout

PPT Slide

LPH / LCC / MCS Normal Config.

LPH / LCC /MCS Layout

PPT Slide

LSD / LPD Normal Config.

LSD / LPD Layout

AD Normal Configuration

AD Layout

AFS / AE Normal Config.

AFS / AE Layout

AO-177 Normal Config.

AO-177 Layout

AOE-1 Normal Config.

AOE-1 Layout

AOR-1 Normal Config.

AOR-1 Layout

CV Normal Config.

CV Spaces Layout

CV Layout

Steam Plant Watchstation Organization

Inport Watch Org.

Engineering Duty Officer

EDO Organizational Relationships

Engineering Duty Officer

EDO Duties

EDO Duties

EDO Duties

Inport Watch Org.

Inport Watches

Inport Watch Org. (Aux Steaming)

Engineroom Watch Org.

Fireroom Watch Org.

Inport Watch Structure

Inport Watch Structure

Inport Watch Organization

Inport Watch Organization

Engineering Officer of the Watch

EOOW Responsibilities

EOOW Responsibilities

EOOW Responsibilities

Underway Watch Org.

Watch Rotation At Sea

Watch Rotation Inport

Watchstander Qualifications

Engineering Training Team & Damage Control Training Team

Steam Plant Operations

Cold Iron

Steam Plant Operations

Aux Steaming

Steam Plant Operations

Casualties

Casualties

Review and Summary

Questions

Author: Mark, Beth, Amanda, & Xander