| Table of ContentsConventional Steam Plant OverviewLT Cox Training Objectives Steam Plant Layouts&Normal Steaming Configurations Machinery Space Config. Machinery Space Config. PPT Slide LHA / LHD Norm. Config. LHA / LHD Layout PPT Slide LPH / LCC / MCS    Normal Config. LPH / LCC /MCS Layout PPT Slide LSD / LPD Normal Config. LSD / LPD Layout AD Normal Configuration AD Layout AFS / AE Normal Config. AFS / AE Layout AO-177 Normal Config. AO-177 Layout AOE-1 Normal Config. AOE-1 Layout AOR-1 Normal Config. AOR-1 Layout CV Normal Config. CV Spaces Layout CV Layout Steam Plant Watchstation Organization Inport Watch Org. Engineering Duty Officer EDO Organizational Relationships Engineering Duty Officer EDO Duties EDO Duties EDO Duties Inport Watch Org. Inport Watches Inport Watch Org. (Aux Steaming) Engineroom Watch Org. Fireroom Watch Org. Inport Watch Structure Inport Watch Structure Inport Watch Organization Inport Watch Organization Engineering Officer of the Watch EOOW Responsibilities EOOW Responsibilities EOOW Responsibilities Underway Watch Org. Watch Rotation At Sea Watch Rotation Inport Watchstander Qualifications Engineering Training Team & Damage Control Training Team Steam Plant Operations Cold Iron Steam Plant Operations Aux Steaming Steam Plant Operations Casualties Casualties Review and Summary Questions | Author: Mark, Beth, Amanda, & Xander |