TIME            KEY EVENTS
 
 
202043		- CONN ALTERS CSE TO 122T TO 				PORT TO CONFORM WITH NAV 				TRACK - SPD STILL 25 KTS
202046		- CC  TUG & TOW PASS DOWN STBD 			SIDE AT 800 YDS ON RECIPROCAL 				HEADING
202048 (ABT)	- NAV PROCEEDS TO OPEN BRIDGE 			BIG EYES AND SEES PORT RUNNING 			LIGHT ON CH
202050 		- OOD DECIDES TO PASS ASTERN OF 			CH ON CONTACTS PORT SIDE
				- ORDERS LEFT 5 DEG RUDDER
 
  Notes: 
  
  
CIC, ALTHOUGH UNDERMANNED, IS KEEPING A FAIRLY COMPLETE SURFACE PICTURE ON THE DRT WITH A TOTAL OF TEN TRACKS BEING REPORTED TO THE BRIDGE WITH CPA’S LESS THAN 5000 YDS.  BRIDGE IS ACKNOWLEDGING CIC REPORTS BUT NOT PROVIDING ANY FEEDBACK.
BRIDGE HAS SCOPE HEAD CPA OF 350 YDS TO PORT  FOR  ‘CH’.
OOD, JOOD, AOOD, CONN AND NAVIGATOR SEE WHITE LIGHTING WITH NO VISIBLE SIDELIGHTS -- OOD MISINTERPRETS AS STERN ASPECT.  ONE WATCHSTANDER SEES A WHITE OVER RED LIGHT SCHEME ON THE MAST --- BUT THIS IS DISCOUNTED SINCE A VESSEL THIS LARGE COULDN’T BE A PILOT VESSEL.
AOOD REPORTS 130 TARGET ANGLE, USING CO’S BINOCULARS
FOLLOWING SLIDE GIVES A GRAPHICAL PRESENTATION OF THE SURFACE PICTURE