ENGINEER COMBAT BATTALION (CORPS)(MECHANIZED) DESIGNATION _______ ENGINEER BATTALION (COMBAT)(CORPS)(MECHANIZED) TOE 05435L200 WHEN ORGANIZED WITH MECHANIZED ENGINEER COMPANIES TOE 05435L300 WHEN ORGANIZED WITH MECHANIZED ENGINEER COMPANIES WITH GRIZZLY AND AVLB/WOLVERINE 1. MISSION. A. TO INCREASE THE COMBAT EFFECTIVENESS OF THE CORPS BY ACCOMPLISHING MOBILITY, COUNTERMOBILITY, LIMITED SURVIVABILITY, AND GENERAL ENGINEERING TASKS. B. TO REINFORCE THE HEAVY DIVISION, ENHANCED AND SEPARATE HEAVY BRIGADES, AND ARMORED CAVALRY REGIMENTS. C. TO PERFORM COMBAT MISSIONS IN THE ROLE OF INFANTRY, WHEN REQUIRED. D. PARTICIPATES IN JOINT MILITARY OPERATIONS. 2. ASSIGNMENT. TO A CORPS NORMALLY ATTACHED TO AN ENGINEER BRIGADE OR ENGINEER GROUP. 3. CAPABILITIES. A. AT LEVEL 1, THIS UNIT: (1) PROVIDES COMMAND AND CONTROL AND STAFF SUPERVISION FOR ASSIGNED AND ATTACHED UNITS. (2) PROVIDES ENGINEER SUPPORT IN THE CONSTRUCTION OF OBSTACLES AND DEFENSIVE POSITIONS. (3) CONDUCTS LIMITED BREACHING OPERATIONS. THE ABSENCE OF THE COMBAT ENGINEER VEHICLE (CEV) PRESENTS A SIGNIFICANT REDUCTION IN THE ENGINEER COMMANDER'S ABILITY TO BREACH OBSTACLES WHEN SUPPORTING BREACHING OPERATIONS. AT A MINIMUM, A MANEUVER TASK FORCE WITH ONE ENGINEER COMPANY LOSES THE FULL ABILITY TO REDUCE TWO LANES MECHANICALLLY, AS OUTLINED IN FM 90-13-1, COMBINED ARMS BREACHING OPERATIONS. THIS DEFICIENCY WILL BE CORRECTED ONCE THE GRIZZLY IS FIELDED. (4) PROVIDES ENGINEER SUPPORT FOR BRIDGE CONSTRUCTION AND ASSISTS IN THE CONSTRUCTION OF FLOATING BRIDGES. (5) PERFORMS LIMITED GENERAL ENGINEERING TASKS SUCH AS, CONSTRUCTION, REPAIR AND MAINTENANCE OR LANDING STRIPS, HELIPORTS, COMMAND POSTS, COMBAT TRAILS, DRAINAGE STRUCTURES, FORDS AND OTHER HORIZONTAL CONSTRUCTION TASKS WHEN AUGMENTED WITH A COMBAT SUPPORT EQUIPMENT COMPANY, TOE 05423L000. (6) PROVIDES TECHNICAL ADVICE, ASSISTANCE AND TRAINING IN MINE WARFARE, FIELD FORTIFICATION, CAMOUFLAGE, DEMOLITION AND ENGINEER RECONNAISSANCE TECHNIQUES. (7) PROVIDES ENGINEER INFORMATION, RECONNAISSANCE AND DEVELOPS ENGINEER INTELLIGENCE. (8) FIGHTS AS INFANTRY IAW CHAPTER 6, FM 5-100, ENGINEER OPERATIONS, WHEN REQUIRED. (9) PROVIDES COMBAT ENGINEER SUPPORT FOR AN INDEPENDENT TASK FORCE OR A JOINT MILITARY OPERATION, WHEN REQUIRED. (10) PARTICIPATES IN REAR AREA PROTECTION (RAP) OPERATIONS WHEN REQUIRED. (11) PROVIDES UNIT LEVEL MEDICAL SUPPORT BY PROVIDING MEDICAL AIDMEN TO THE ENGINEER COMBAT PLATOONS. (12) WHEN ORGANIZED UNDER TOE 05435L300, THIS UNIT CAN EMPLACE AND MAINTAIN ASSAULT BRIDGES TO SPAN TWELVE 60-FOOT GAPS SIMULTANEOUSLY. B. THE COLUMNS UNDER LEVELS 2 AND 3 ADAPT THIS TABLE FOR REDUCED OPERATIONAL CAPABILITIES IN DECREMENTS OF 10% FROM APPROXIMATELY 90% FOR LEVEL 2 TO APPROXIMATELY 80% FOR LEVEL 3. C. THIS UNIT IS NOT ADAPTABLE TO TYPE B ORGANIZATION. D. THE COLUMNS DESIGNED BY LEVEL 1 THROUGH 3 ARE DESIGNED TO RELATE TO THE CATEGORIES ESTABLISHED BY AR 220-1, UNIT STATION REPORTING. E. INDIVIDUALS OF THIS ORGANIZATION, EXCEPT THE CHAPLAIN AND MEDICAL PERSONAL, CAN ASSIST IN THE COORDINATED DEFENSE OF THE UNIT'S AREA OR INSTALLATION. F. UNIT MAINTENANCE: PERFORMS UNIT MAINTENANCE ON ORGANIC EQUIPMENT. G. DEPENDENCIES: THIS UNIT IS DEPENDENT UPON: (1). APPROPRIATE ELEMENTS OF THE CORPS FOR, MAJOR HEALTH SERVICES, LEGAL, FINANCE, PERSONNEL AND ADMINISTRATIVE SERVICES. (2). ENGINEER MULTI-ROLE BRIDGE ROLE COMPANY (TOE 05473L000) FOR TACTICIAL BRIDGING EQUIPMENT. (3). ENGINEER COMBAT SUPPORT EQUIPMENT COMPANY (TOE 05423L0) FOR AUGMENTATION WITH CONSTRUCTION EQUIPMENT TO MOVE EARTH AND OTHER HORIZONTAL PROJECTS, SUCH AS ROADS AND AIRSTRIPS. 4. BASIS OF ALLOCATION: TWO PER HEAVY DIVISION. 5. CATEGORY: THIS UNIT IS DESIGNATED A CATEGORY 1 UNIT. (FOR UNIT CATEGORIES, SEE AR 310-25) 6. MOBILITY. FOR MOBILITY OF THE ORGANIZATIONAL COMPONENTS OF THIS UNIT, SEE SECTION I, GENERAL, OF THE RESPECTIVE TOE LISTED IN THE SECTION II OF THIS TOE. 7. DOCTRINE, THE FOLLOWING DOCTRINAL PUBLICATIONS ARE APPLICABLE TO THE OPERATIONS OF THIS UNIT: FM 5-71-100, DIVISIONS ENGINEERING COMBAT OPERATIONS FM 5-100, ENGINEER COMBAT OPERATIONS FM 5-100-15, CORPS ENGINEER OPERATIONS FM 5-103, SURVIVABILITY FM 5-104, GENERAL ENGINEERING FM 5-105, TOPOGRAPHIC OPERATIONS FM 5-116, ENGINEER OPERATIONS - EAC FM 7-20, THE INFANTRY BATTALION FM 71-100, DIVISION OPERATIONS FM 90-7, COMBINED ARMS OBSTACLES INTEGRATION FM 90-13, RIVER CROSSING OPERATIONS FM 90-13-1, COMBINED ARMS BREACHING OPERATIONS FM 100-5, OPERATIONS FM 100-7, DECISIVE FORCE: THE ARMY IN THEATRE OPERATIONS FM 100-15, CORPS OPERATIONS FM 100-16, ARMY OPERATIONAL SUPPORT JP 3-34, JOINT DOCTRINE FOR ENGINEER OPERATIONS (DRAFT) JP 4-04, JOINT DOCTRINE FOR CIVIL ENGINEERING SUPPORT ------------- \ ENGR CBT \ \ BN (CORPS)\ \ \ ------------- \ \ --------------------------------------------------------------- \ \ \ \ \ \ -------------- -------------- \ HQ & HQ CO \ \ 3 END CO \ \ \ \ \ \01 \ \ 02 \ -------------- -------------- TITLE 05435L300 ENGINEER BATTLION, CORPS (M) EXECUTIVE SUMMARY 1. PURPOSE. The attached documentation represents the changes that have occurred as a result of the cyclic review of the L-edition TOE. As part of the cyclic review process, the TOE has been updated to reflect current doctrine and operational concepts, to apply current OPFAC rules, to demodernize the base TOE and to include the latest BOIP in the objective TOE. This C-edition table was created as an aid in reviewing all the changes that were made as a result of cyclic review. a. NEW TOE: NO PROJECTED E-DATE: b. CYCLIC REVIEW: YES CURRENT E-DATE: 940405 c. AUTHORITY: (1) ARSTRUC: No DATE: STR CAP: (2) CSA FDU: NO DATE: STR CAP: (3) AR 71-32: YES CTU DATE: 9904 d. This package pertains to: NEW TOE MULTPR TITLE STR CAP 05436C300 HHC, Engr BN, CORPS (M) 161 05437C300 3 Engr Co, Engr Bn, Corps (M) 105 REPLACED TOE MULTPR TITLE STR CAP 05436L300 HHC, Engr BN, CORPS (M) 163 05437L300 3 Engr Co, Engr Bn, Corps (M) 105 e. Major Changes. As part of the cyclic review process, this DTOE has been updated to reflect current standards of grade (SG), manpower requirements criteria (MARC), basis-of-issue plans (BOIP), and doctrine. No structural changes have been applied. 2. MISSION/CAPABILITIES/SECTION I. a. Provides command and control, staff planning, supervision, unit level administration and medical aidmen, and an engineer special staff section for the maneuver Brigades. b. See TOE Section 1 for a complete list of capabilities and limitations of this organization and it subordinate units. 3. ASSIGNMENT. TO A CORPS NORMALLY ATTACHED TO AN ENGINEER BRIGADE OR ENGINEER GROUP. 4. PERSONNEL. a. Differences between design and documented OTOE requirements where the design OTOE equals the unit strength CAP. TOE DESIGN DOCUMENTED DIFFERENCE 05436L300 163 161 -2 05437L300 105 105 b. MARC Deviations. NONE. c. Detailed rationale for doctrinal personnel requirements is in the accompanying TOE Analysis--Narrative Discussion. d. No net officer and one NCO loss force impact of this TOE. e. The risk resulting from decrements is negligible. 5. EQUIPMENT. a. Equipment reflected in this TOE represents the minimal essential wartime requirements. b. The following items of modernization equipment were approved by HQDA for inclusion in the Base TOE and have been applied: BOIP LIN NOMENCLATURE AUTHORITY T013AD T61494 HMMWV TWVRMO c. Major items of equipment in each TOE are: TOE BTOE OTOE 05436C300 Boat, Recon(B84404) 1 1 M577(D11538/C11158) 2 2 M113(D12087/C18234) 1 1 Steam Cleaner 1 1 M88 3 3 S250 Shelter(T07543) 1 0 Contact Trk(T10138/T07679 3 3 Org Rep Lt Trk 1 1 HMMWV 14 15 POL Tankers(5T/T87243) 7 4(HEMTT) Common #1 4 4 Trl, 3/4T(W95537) 2 Trl, 1 1/2T(W95811) 26 0 Water Trl 3 3 Trk, 2 1/2T(X40009/X40146) 18 0 Trk, 5T(X40831) 15 0 Forklift(X48194/Z94028) 1 1 Wrecker 5T 3 3(HEMTT) Welding Shop 1 1 Field Kitchen 0 2 Sanitation Ctr 0 2 Trl, Flt 11T(T45465) 0 3(HEMAT) Trk, LMTV 0 18 Trk, HEMTT(T59278) 0 7 Trl, LMTV(Z36068) 0 11 Trl, 3/4T (Z36272) 0 3 M1097(Z65205) 0 3 05437C300 Boat Recon 2 2 M113 9 9 Bridge 4 4 Trk, MET 4 0 HMMWV 6 6 Dozers 6 0 Bolster Trl 2 2 Trl, 1 1/2T 9 6 Trk, 2 1/2T 1 0 Trk, 5T Dump 4 0 M578 0 2 Volcano 0 2 SEE 0 2 HEMTT 0 2 LMTV 0 1 ACE 0 6 Trl, LMTV 0 3 MICLIC (L67342) 0 4 MTV, DUMP 0 4 JAVELIN 0 3 6. COST. a. Cost Analysis Summaries for each Objective TOE are provided below. b. Force structure information for each TOE is based on current M-Force and E-Date 9904. c. HQDA approved commodity consumption rates were used in the development of these TOEs and are reflected in the Cost Analysis Summaries. d. The difference in cost are primarily due to the increased requirement for equipment. A review of the MARC application also reduced the number of personnel. 7. Cost Analysis Summaries. NEW TOE OLD TOE DELTA NUMBER 05435C300 05435L300 TITLE ENG BN, CORPS (M) ENG BN, CORPS (M) PERSONNEL IMPACT BY: OFF/WO/NCO/ENL/AGGR) OTOE STR 28/01/164/283/476 28/01/165/284/478 00/00/-1/-1/-2 UNIT BY COMPO: (1/2/3/4/AGGR) 2/0/3/0/5 2/0/3/0/5 FORCE IMPACT BY COMPO: OFF/WO: 58/0/58/00/116 58/0/58/00/116 00/00/00/00/00 NCO: 328/0/492/0/820 330/0/495/0/825 -2/00/-3/00/-5 COSTS: PERSONNEL: $14,678,293 $14,634,030 $ 44,263 EQUIPMENT: $79,312,080 $79,393,343 $ 81,263- TOTALS: $94,481,340 $94,426,344 $ 54,996