ENGINEER COMBAT BATTALION, HEAVY DESIGNATION: ----- ENGINEER BATTALION (COMBAT) (HEAVY) 1. MISSION. A. TO INCREASE THE COMBAT EFFECTIVENESS OF DIVISION, CORPS AND THEATER ARMY FORCES BY ACCOMPLISHING GENERAL ENGINEERING TASKS AND LIMITED MOBILITY, COUNTERMOBILITY, AND SURVIVABILITY TASKS. B. TO CONSTRUCT, REPAIR, AND MAINTAIN MAIN SUPPLY ROUTES LANDING STRIPS, BUILDINGS, STRUCTURES AND UTILITIES. C. TO PERFORM REAR AREA SECURITY OPERATIONS WHEN REQUIRED. 2. ASSIGNMENT. TO THE ENGINEER BRIGADE, CORPS, AIRBORNE CORPS, JOINT OR COMBINED TASK FORCE AND ECHELONS ABOVE CORPS. 3. CAPABILITIES. A. AT LEVEL 1, THIS UNIT: (1) PERFORMS ENGINEERING TASKS SUCH AS CONSTRUCTION, REHABILITATION, REPAIR, MAINTENANCE, AND MODIFICATION OF LANDING STRIPS, AIRFIELDS, COMMAND POSTS, MAIN SUPPLY ROUTES, SUPPLY INSTALLATIONS, BUILDING STRUCTURES, BRIDGES AND OTHER RELATED TASKS AS REQUIRED, GENERALLY TO THE REAR OF THE DIVISION. (2) PROVIDES REPAIRS AND LIMITED RECONSTRUCTION OF RAILROADS, SEWAGE AND WATER FACILITIES. (3) PROVIDES BITUMINOUS PAVING OPERATIONS AND QUARRYING AND CRUSHING OPERATIONS, REHABILITATES PORTS, AND CONSTRUCTS PIPELINES WHEN AUGMENTED WITH SPECIALIZED ENGINEER PERSONNEL AND EQUIPMENT. (4) PROVIDES FIELD ENGINEERING ASSISTANCE AND SUPPORT TO DIVISION ENGINEER IN PREPARATION OF PROTECTIVE POSITIONS (5) CONDUCTS ENGINEER RECONNAISSANCE. (6) CREATES OBSTACLES TO DEGRADE ENEMY MOBILITY IN REAR AREAS. (7) CLEARS OBSTACLES AS PART OF AREA CLEARANCE OPERATION, NOT AS PART OF ASSAULT BREACHING OPERATIONS. (8) PERFORMS REAR AREA OPERATIONS TO INCLUDE INFANTRY COMBAT MISSIONS WITHIN LIMITATIONS OF ORGANIC WEAPONS AND EQUIPMENT. (9) SUPERVISES CONTRACT CONSTRUCTION, SKILLED CONSTRUCTION LABOR AND UNSKILLED INDIGENOUS PERSONNEL. (10) CONDUCTS AREA DAMAGE CLEARANCE/RESTORATION OPERATIONS. (11) PROVIDES RELIGIOUS SUPPORT MISSION TO ASSIGNED AND ATTACHED UNITS. B. THE COLUMNS UNDER LEVELS 2 AND 3 ADAPT THIS TABLE FOR REDUCED OPERATIONAL CAPABILITIES IN DECREMENTS OF 10%, FROM APPROXIMATELY 90% FOR LEVEL 2, TO APPROXIMATELY 80% FOR LEVEL 3. C. THIS UNIT IS NOT ADAPTABLE TO TYPE B ORGANIZATION. D. THE COLUMNS DESIGNATED BY LEVEL 1 THROUGH 3 ARE DESIGNED TO RELATE TO THE CATEGORIES ESTABLISHED IN AR 220-1, UNIT STATUS REPORTING. E. WITH ATTACHMENT: WHEN SUPPORTED BY ATTACHMENTS OF SPECIALIZED PERSONNEL AND EQUIPMENT THE BATTALION PROVIDES: (1) QUARRYING AND CRUSHING OPERATIONS (QUARRY TEAM - TOE 05520LC) (2) REHABILITATION OF PORTS (ENGINEER COMPANY, PORT OPENING, TOE 05603LO). (3) CONSTRUCTION OF PETROLEUM PIPELINES AND STORAGE FACILITIES (PIPELINE CONSTRUCTION SUPPORT COMPANY, TOE O5434LO). (4) POWER DISTRIBUTION (ENGINEER PRIME POWER BN, 05615L). (5) WELL DRILLING (05520LE00). (6) CONSTRUCTION SUPPORT EQUIPMENT AND PERSONNEL FOR ROCK CRUSHING, BITUMINOUS MIXING AND PAVING. (ENGINEER CONSTRUCTION SUPPORT COMPANY, TOE 05413L0). F. INDIVIDUALS OF THIS ORGANIZATION, EXCEPT MEDICAL PERSONNEL AND THE CHAPLAIN, CAN ASSIST IN THE COORDINATED DEFENSE OF THE UNIT'S AREA OR INSTALLATION. G. THIS UNIT PERFORMS DIRECT SUPPORT MAINTENANCE ON ENGINEER AND POWER GENERATION EQUIPMENT FOR THE BATTALION AND UNIT MAINTENANCE ON ORGANIC EQUIPMENT EXCEPT MEDICAL EQUIP- MENT. H. THIS UNIT IS DEPENDENT UPON APPROPRIATE ELEMENTS OF CORPS FOR HEALTH SERVICE SUPPORT, LEGAL, UNIT MAINTENANCE OF MEDICAL EQUIPMENT, NON-DIVISIONAL, DS FOR ASL SUPPORT FOR ENGINEER AND POWER GENERATION EQUIPMENT, FINANCE, AND PERSON- NEL AND ADMINISTRATIVE SERVICES. 4. BASIS OF ALLOCATION. ONE PER DIVISION AND .246 PER WORK- LOAD PER 1000 MANHOURS ENGINEER CONSTRUCTION PER DAY. 5. CATEGORY. THIS UNIT IS DESIGNATED A CATEGORY II UNIT. (FOR UNIT CATEGORIES, SEE AR 310-25.) 6. MOBILITY. A. THIS UNIT IS CAPABLE OF TRANSPORTING 1,224,965 POUNDS (60,994 CUBE) OF TOE EQUIPMENT WITH ORGANIC VEHICLES. B. THIS UNIT HAS 1,486,611 (45,206 CUBE) POUNDS OF TOE EQUIPMENT REQUIRING TRANSPORTATION. C. THIS UNIT REQUIRES 100 PERCENT OF ITS TOE EQUIPMENT AND SUPPLIES BE TRANSPORTED IN A SINGLE LIFT USING ITS AUTHORIZED ORGANIC VEHICLES. (SOURCE: ENGINEER SCHOOL MEMORANDUM, DTD 8 FEB 94). 7. DOCTRINE. THE FOLLOWING DOCTRINAL PUBLICATIONS ARE APPLICABLE TO THE OPERATION OF THIS UNIT: FM 5-100, ENGINEER COMBAT OPERATIONS. FM 5-100-15-1, CORPS ENGINEER OPERATIONS FM 5-101, MOBILITY. FM 5-102, COUNTERMOBILITY. FM 5-104, GENERAL ENGINEERING FM 5-105, SURVIVABILITY. FM 5-114, ENGINEER OPERATIONS, SHORT OF WAR FM 5-116, ENGINEER OPERATIONS, EAC FM 5-430-00-1/2, PLANNING AND DESIGN OF ROADS, AIRFIELDS, AND HELIPORTS IN THE THEATER OF OPERATIONS FM 5-480, PORT CONSTRUCTION AND REPAIR FM 5-482, MILITARY PETROLEUM PIPELINE SYSTEMS FM 100-5, OPERATIONS FM 100-7, DECISIVE FORCE: THE ARMY IN THEATER OPERATIONS FM 100-16, ARMY OPERATIONAL SUPPORT ------------- \ ENGR CBT \ \ BN HVY \ \ \ ------------- \ ------------------------ \ \ ------------- ------------- \ HHC & \ \ 3 ENGR \ \ SPT CO \ \ CBT CO \ \01 \ \02 \ ------------- ------------- DTOE 05415COOO ENGINEER BATTALION (Combat) (Heavy) EXECUTIVE SUMMARY 1. PURPOSE. The attached Table of Organization and Equipment (TOE) revises the HQDA approved L-Edition TOE 05415LOOO for the Engineer Battalion, (Combat) (Heavy). The DTOE was prepared IAW updated manpower requirements and established TOE development procedures and regulatory guidelines. a. NEW TOE: NO PROJECTED E-DATE: b. CYCLIC REVIEW: YES CURRENT E-DATE: 961031 c. AUTHORITY: (1) ARSTRUC: NO DATE: STR CAP: (2) CSA FDU: NO DATE: STR CAP: (3) AR 71-32: YES CTU DATE: 9904 d. This package pertains to: NEW TOE MLTPR TITLE STR 05415COOO 1 Engineer Battalion, 630 (Combat) (Heavy) 05416COOO 1 Headquarters and Headquarters 207 Company, Engineer Battalion, (Combat) (Heavy) 05417COOO 3 Engineer Company, Engineer 141 Battalion, (Combat Heavy) OLD TOE MLTPR TITLE STR 05415LOOO 1 Engineer Battalion, 652 (Combat) (Heavy) 05416LOOO 1 Headquarters and Headquarters 220 Company, Engineer Battalion, (Combat) (Heavy) 05417LOOO 3 Engineer Company, Engineer 144 Battalion, (Combat) (Heavy) e. Major Changes. These DTOEs have been updated to: reflect current standards of grade authorization (SGA), manpower requirements criteria (MARC), basis of issue plans (BOIPs), and doctrine. The following structural changes have been applied. (1) Nine 62B reduced Three (E7), Three (E5), Three (E4), Three 63B40 added, Two 91B30 added, One 92Y20 reduced One (E3), Seven 51T Two (E5), Three (E4), Two (E3) Two 62F10 reduced, One (E4), One (E3), Two 75B10 reduced One (E4), One (E3), One 91B10 (E4) reduced, One 92G10 (E4) reduced, One 63B10 (E3) reduced. 2. MISSION/CAPABILITIES/SECTION 1. a. Performs engineering tasks such as construction, rehabilitation, repair, maintenance, and modification of landing strips, airfields, command posts, main supply routes, supply installations, building structures, bridges and other related tasks as required, generally to the rear of the division. b. Provides repairs and limited reconstruction of railroads, sewage and water facilities. c. Provids bituminous paving operations and quarrying and crushing operations, rehabilitates ports, and constructs pipelines when augmented with specialized engineer personnel and equipment. d. See TOE Section I(s) for a complete list of capabilities and limitations of this organization and its subordinate units. 3. ASSIGNMENT. Organic to the corp, based on one battalion per division. 4. PERSONNEL. a. Differences between design (replaced) and documented OTOE requirements where the documented OTOE equals the unit strength CAP. TOE DESIGN DOCUMENTED DIFFERENCE 05416COOO 220 207 0/0/-13/-13 TOE DESIGN DOCUMENTED DIFFERENCE 05417COOO 144 141 0/0/0/-9 b. MARC Deviations. NONE. c. The net officer/NCO force impact of this TOE is no increase of officer or NCO. d. There is no risk resulting from deviations. 5. EQUIPMENT. a. The following items of modernization equipment were coordinated with HQDA for inclusion in the BTOE and have been applied: NONE. b. Major items of equipment are as follows: TOE BTOE OTOE 05416COOO 1 Backhoe SHVL 20T 0 Backhoe SHVL 20T 1 Crane SHVL 12 1/2T 0 Crane SHVL 12 1/2T 1 Crane TRK MTD 25T 1 Crane TRK MTD 25T 1 Roller Motorized 1 Roller Motorized 2 Roller Vibratory 2 Roller Vibratory 3 Shop EQ Contact 3 Shop EQ Contact 1 Shop EQ Contact 1 Shop EQ Contact 1 Shop EQ Contact 1 Shop EQ Contact 1 Shop EQ Contact 1 Shop EQ Contact 1 Trk Util Shltr 1 Trk Util Shltr 1 Trk Ambul 1 Trk Ambul 1 Trk Concrete 1 Trk Concrete 7 Trk Tractor 8X6 7 Trk Tractor 8X6 6 22 1/2T Trl, LB 6 22 1/2T Trl, LB 6 40T Trl, LB 6 40T Trl, LB 3 Tractor FT LS 3 Tractor FT LS 3 Tractor FT LS 3 Tractor FT LS 2 Trk Cgo 2-1/2T 2 Trk Cgo 2-1/2T 6 Trk Cgo 5T LWB 6 Trk Cgo 5T LWB 9 Trk Dump 20T 9 Trk Dump 20T 2 Trk LF DED 6000 LB 2 Trk LF DED 6000 LB 2 Trk LF DED 1000 LB 2 Trk LF DED 1000 LB 4 Trk Trac 5T 6X6 4 Trk Trac 5T 6X6 1 Trk Wkr 10T 1 Trk Wkr 10T 1 Trk Wkr 5T 6X6 1 Trk Wkr 5T 6X6 9 Trk Cgo 2-1/2T 9 Trk Cgo 2-1/2 18 HMMWV 18 HMMWV 13 1-1/2T Trl 13 1-1/2T Trl 2 3/4T Trl 2 3/4T Trl 05417C000 06 Trk Util 4X4 06 Trk Util 4X4 03 Grader RD 05 LMTV Trk Cgo 02 Loader scoop 01 Trk Util HMMWV 07 Trk Trac MET 07 Trk Trac MET 02 Tnk Pmp Unit 01 Trk Cgo MTV 01 Trk Wkr 5T 6X6 01 Trk Wkr Tact 8X8 10 Trk Dmp 5T 10 Trk Dmp 5T 02 Trk Tk Fl 2500 gal 02 Trk Tk Fl 2500 gal 02 Dist Water 02 Dist Water 01 Compactor 01 Compactor 02 Tractor FT LS 02 Tractor FT LS 03 Tractor FT LS 03 Tractor FT LS 04 Vibrator Concrete 04 Vibraotr Concrete 01 Crane Whl Mtd Hyd 01 Crane Whl,Mtd Hyd 06 Trk Cgo 2 1/2T 12 3/4T Trl 03 Trk Cgo 5T 6X6 01 Trl Water 400 gal 01 3/4T Trl 11 Trl Cgo LMTV 2 1/2T 01 Trl Water 400 gal 13 Trl Cgo 2 1/2T 6. Cost: a. Cost Analysis summaries for each objective TOE are provided below. b. Force structure information for each TOE is based on current M-Force and E-Date 9904. c. The difference in cost is primarily due to personnel reductions, OPFAC requirement changes. 7. COST ANALYSIS SUMMARIES. NEW TOE OLD TOE NUMBER 05415C000 05415L000 TITLE ENGR BN, (COMBAT) (HEAVY) ENGR BN, (COMBAT) (HEAVY) PERSONNEL IMPACT BY: (OFF/WO/NCO/ENL/AGGR) OTOE STR 31/03/213/383/630 31/03/221/397/652 0/0/-8/-14/-22 UNITS BY COMPO: (1/2/3/4/AGGR) 7/19/14/0/40 FORCE IMPACT BY COMPO (OTOE) OFF/WO: 238/646/646/0/1530 238/646/646/0/1530 0/0/0/0/0 NCO: 1491/4047/2982/0/8520 1547/4199/3094/0/8840 -56/-152/-112/0/-320 COST: PERSONNEL: $10,761,944. $11,009,593. $-247,649. EQUIPMENT: $19,120,522. $18,917,238. $ 203,284. TOTAL: $29,882,466 $29,926,831. $ -44,365.